Elysium Power & Energy
Illustrative power generation facility

From power requirementto a bankable concept in days.

A fixed-fee engineering study that determines the optimal generation configuration for your data center, AI infrastructure or mission-critical facility.

Configure my power plant
AI & data centers

Reliable, scalable power for hyperscale demands.

Independent engineering

OEM-neutral, technology-based recommendations.

Fast turnaround

From power requirement to engineer-reviewed concept.

Proven methodology

Reliability, cost, emissions and permitting integrated.

Elysium Power Configuration — $24,500 fixed-fee study

An independent engineering evaluation of the optimal power generation configuration for your project.

  • Technology comparison and recommendation
  • Site-adjusted generation capacity and N+1 configuration
  • Natural gas, water and cooling requirements
  • Emissions and permitting roadmap
  • Electrical architecture (13.8 / 34.5 kV) and conceptual one-line
  • Conceptual plot plan and major equipment layout
  • TIC / CAPEX estimate and schedule
  • Key risks and execution considerations
Configure my power plant

Delivered in 5 business days

  1. Inputs: You provide complete project information.
  2. Analysis: OEM-neutral engineering evaluation.
  3. Configuration: Optimal solution with costs, emissions and schedule.
  4. Report: Complete study delivered in 5 business days after complete inputs.

Sample deliverables

  • Technology comparison
  • Block flow diagram
  • Conceptual 3D layout
  • Electrical one-line (13.8 / 34.5 kV)
  • TIC / CAPEX estimate
  • Project schedule

From concept to execution

After the configuration study, we can support further development studies, Pre-FEED, FEED, owner’s engineering and EPC support.

Configuration study

$24,500 · 5 business days

Development study

From $75K

Pre-FEED

From $125K

Execution support

FEED · owner’s engineering · EPC